Chandrayaan 3 Live Status, All You Need To Know About ISRO’s Moon Mission

The Indian Space Research Organization launched the Chandrayaan-3 mission to the moon on July 14, 2023. ISRO’s Chandrayaan 3 mission achieved a nearly circular orbit when the spacecraft moving in a 174 km wide orbit and 1437 km long around the moon was adapted to carry the spacecraft. in a circular orbit 151 km wide and 179 km long and approached the moon.

According to the information received, the ISRO Command, Tracking and Telemetry Network in Bengaluru started the orbit reduction process on August 16, 2023. Afterwards, the spacecraft will enter a 100 km wide lunar circular orbit. ISRO aims to perform a soft landing of the Chandrayaan 3 lander on the lunar surface of the south pole on August 23, 2023. After this, India will become the fourth country to land its payload on the Moon.

The Russian Luna 25 spacecraft is also heading towards the Moon and is expected to land at the South Pole on August 21, 2023. The country whose spacecraft lands first on the South Pole of the Moon will become the first country to achieve this feat. Here we will learn about the Chandrayaan 3 live status and find out the latest updates about ISRO’s lunar mission.

Chandrayaan 3 Moon Landing Live Updates

What is Chandrayaan 3 2023 mission?

  • Chandrayaan-3 is India’s third lunar mission and the second soft-landing attempt on the lunar surface.
  • For this mission, Chandrayaan-3 was launched on July 14, 2023 at 14:35 from the Satish Dhawan Space Center (SDSC) in Sriharikota.
  • It has a native lander (LM), propulsion module (PM) and rover designed to develop and demonstrate new technologies needed for interplanetary missions.
  • With the launch of this mission, the Indian Space Research Organization (ISRO) is preparing for a successful soft landing on the Moon.
  • India is aiming to become the fourth country in the world to achieve this feat, after the United States, Russia and China.
See also  SEE: Scandal June 29, 2023 full episode updates

Chandrayaan Live Status 3 2023

As part of India’s ambitious lunar mission, today, i.e., on August 17, 2023, the Chandrayaan-3 propulsion module will be separated from the lander and rover. Now the propulsion module will study the radiations coming from Earth by staying in lunar orbit for 3 to 6 months, while the lander will land on the lunar surface on August 23, 2023 at 5:47 p.m.

Where he will carry out other experiments including the search for water for 14 days. It approached the Moon on August 16, 2023, and now Chandrayaan-3’s distance from the Moon’s surface is only 150 km. With this the last phase of the mission’s success has begun. In which the eyes of many great countries of the world are placed.

Chandrayaan 3 Live 2023 Overview

Organization name’s Indian Space Research Organization
mission name chandrayan 3
Chandrayaan 3 Release Date July 14, 2023, 2:35 a.m.
landing region South Pole
planned landing date 23 August 2023
last landing place 500m×500m
official website isro.gov.in

Chandrayaan 3 Live Status, All You Need To Know About ISRO's Moon Mission

Latest Updates on ISRO’s Lunar Mission 2023

The Indian Space Research Organization (ISRO) has shared the latest updates on ISRO’s Lunar Mission 2023 and the journey of Chandrayaan-3. This mission has completed the entire process of reaching the moon. As per our expectations, Chandrayaan-3 was placed in the 153 km X 163 km orbit of the Moon. The Moon fringe entry process is complete and today the propulsion module and lander are ready to separate.

Preparations are underway for a soft landing on the moon on August 23, 2023. ISRO has succeeded in placing Chandrayaan-3 into more than five lunar orbits gradually in the three weeks since its launch on July 14, 2023 and August 1. of 2023. , the vehicle was successfully sent from Earth’s orbit to the Moon.

See also  Like We Just Met Lyrics NCT Dream Meaning Explained

Chandrayaan 3 important dates

First orbit elevation maneuver July 15, 2023
Second orbit elevation maneuver July 16, 2023
Third orbit elevation maneuver July 18, 2023
Fourth orbit elevation maneuver July 20, 2023
Fifth orbit elevation maneuver July 25, 2023

Chandrayaan Live Status FAQ 3 2023

Why is August 17, 2023 special for ISRO Lunar Mission 2023?

August 17, 2023 is special for Chandrayaan-3. India’s lunar mission will be divided into two parts today. Around one o’clock the Chandrayaan-3 integrated module will split in two.

What will India achieve after the successful soft landing of its mission on the Moon?

According to ISRO, Chandrayaan will land on the lunar surface on August 23. If it achieves a soft landing, India will become the fourth country to do so after the United States, Russia and China. There were several spacecraft accidents before both the United States and Russia successfully landed on the Moon. China is the only country that succeeded in its first attempt with the Chang’e-3 mission in 2013.

When was Chandrayaan 3 Mission 2023 released?

Chandrayaan 3 Mission 2023 was launched from Sriharikota on July 14, 2023.

Categories: Trending
Source: vtt.edu.vn

Leave a Comment